Blastr plans €4bn Finnish green steel plant
Norwegian startup aims to begin production by 2026
Norwegian startup Blastr has announced plans to build a €4bn ($4.24bn) green steel and integrated hydrogen production facility in Finland. Blastr plans to replace coke and coal with hydrogen in the chemical reduction phase, in addition to reducing emissions throughout the value chain, with a target of 95pc lower CO₂ emissions compared with conventional steel manufacturing. The firm plans to produce 2.5mn t/yr of hot- and cold-rolled green steel at the plant, with first production in 2026. The firm has signed a letter of intent with energy company Fortum providing exclusive rights to utilise an existing industrial site near the port of Inkoo. “Inkoo was selected as our location due to its hig
Also in this section
24 April 2024
Demand for energy purposes to outpace feedstock applications by the 2040s as government policies drive consumption, says DNV
24 April 2024
Danish firm joins growing list of European electrolyser manufacturers establishing production in US as IRA incentives prove strong draw
19 April 2024
UAE renewables developer weighs opportunities to join green hydrogen projects in US and Canada, Andreas Bieringer, director of green hydrogen business development and commercial, tells Hydrogen Economist
17 April 2024
Building green hydrogen ports and lower production costs key to becoming global exporter