6 April 2010
European supergrid gaining momentum
The failure to build the grid, it says, will severely curtail the effectiveness of new renewable generating capacity, such as the UK's burgeoning offshore wind sector. A lack of interconnectivity between European national power grids means surplus power generated by intermittent resources, such as wind and solar, in one part of the continent cannot be directed to areas of high demand elsewhere and is going to waste. The European Wind Energy Association estimates that 10% of Europe's electricity requirements could be met by offshore wind, but only if its development is supported by a pan-European power grid. At present, more than 90% of electricity generated in Europe is consumed in the coun
Also in this section
19 January 2026
Newfound optimism is emerging that a dormant exploration frontier could become a strategic energy play and—whisper it quietly—Europe’s next offshore opportunity
16 January 2026
The country’s global energy importance and domestic political fate are interlocked, highlighting its outsized oil and gas powers, and the heightened fallout risk
16 January 2026
The global maritime oil transport sector enters 2026 facing a rare convergence of crude oversupply, record newbuild deliveries and the potential easing of several geopolitical disruptions that have shaped trade flows since 2022
15 January 2026
Rebuilding industry, energy dominance and lower energy costs are key goals that remain at odds in 2026






