Essar Oil to build CCS at Stanlow
Carbon dioxide will be permanently sequestered into depleted gas fields under the sea in Liverpool Bay as part of the Hynet cluster
Refiner Essar Oil has announced plans to build a £360mn ($432mn) new carbon-capture plant at its Stanlow refinery. The gas will be permanently sequestered in depleted gas fields under the sea in Liverpool Bay as part of the Hynet cluster project in northwest England. The government designated Hynet North West as a ‘track one’ cluster last year, meaning it is eligible for the first round of state finance. Engineering company Kent has been awarded a pre-Feed contract to evaluate the incorporation of a unit to capture CO₂ from the fluid catalytic cracker at Stanlow. The unit is set to start operating in Q1 2025, with completion in 2027. Once finished, it will capture and store an estimated 0.81
Also in this section
23 April 2024
Europe must unlock cross-border CO₂ trade if it wants to build a viable CCS sector for the long term
16 April 2024
US and European oil majors snap up smaller players and look to accelerate development in a region deemed to possess all the key elements for successful CCUS deployment
15 April 2024
Demand for credits seen rising 20% this year despite issues around integrity and standardisation
11 April 2024
Volatile allowance prices and small size of voluntary market undermine ability to drive investment, says Oxford Institute for Energy Studies